RO PLANT
The Reverse Osmosis Plant installed in the college campus caters to the drinking water needs of all the students, faculty, supporting staff and the visitors. The raw water with an average Total Dissolved Solids [TDS] of 750-1000 ppm is treated to reduce the TDS content to less than 100 ppm the generally acceptable upper limit of the TDS. This is done in three stages, namely: Pre treatment, passage of the water through 12 RO membrane filters held in parallel to each other {main process] and Post treatment. The maximum capacity of the plant is 2500-3000 lit/hr and the utilized capacity is 1000 lit/hr. This water is pure, tasty and hygienic rendering it highly suitable for human consumption.
This plant not only facilitates the supply of safe drinking water but also obviates the otherwise involved huge expenditure for procuring drinking water for the large number of people in the campus. Coolers are connected to this plant providing drinking water in every floor of academic blocks, hostels, canteen etc.
GENERATOR & POWER SUPPLY
Our college campus is powered with 200 KVA HT Line for the entire distribution of power supply to the campus. A separate Genset power house with backup power of 380 KVA shall be used during power failure times for the whole campus. We have an additional standby Genset of 125 KVA for the campus. We also have individual backup of 35 KVA Genset for our ladies hostel.
SEWAGE TREATMENT PLANT
A sewage treatment plant (STP) is a crucial facility that processes wastewater from various sources within an engineering college campus. Its primary goal is to treat and purify sewage, ensuring that harmful pollutants are removed before the water is safely discharged or reused.
SUPPORTING STAFF'S
PHOTO
|
NAME & DESIGNATION
|
---|---|
|
Mrs.V. SENTHAMARAI, A.N.M., NURSE
|
|
Mrs. P. PREMA PRIYA, HSC., Clerk / Tuckshop,
|
|
Mrs. L. KAVIYA, B.Sc., Clerk / Tuckshop,
|